DCHCMPO Logo
File #: 19-158    Version: Name:
Type: Report Status: Passed
File created: 6/4/2019 In control: DCHC MPO Board
On agenda: 10/9/2019 Final action: 10/9/2019
Title: Triangle Strategic Tolling Study - Final Report - Public Hearing (10 minutes) Andy Henry, LPA Staff
Attachments: 1. 2019-10-09 (19-158) Compilation of Toll Comments.pdf, 2. 2019-10-09 (19-158) Toll Letter To NCDOT Div 5.pdf, 3. 2019-10-09 (19-158) Statement of Principles (Toll).pdf, 4. 2019-09-25 (19-158) Compilation of Toll Comments.pdf, 5. 2019-09-25 (19-158) Toll Letter.pdf, 6. 2019-09-25 (19-158) Toll - Statement of Principles.pdf, 7. 2019-09-11 (19-158) Toll Study-Compilation Of Comments.pdf, 8. 2019-07-24 (19-158) TriangleTollingStudy.pdf, 9. 2019-06-12 (19-158) TriangleTollingStudy.pdf

Title

Triangle Strategic Tolling Study - Final Report - Public Hearing (10 minutes)

Andy Henry, LPA Staff

 

Narrative

The MPO Board released the final report of the Triangle Strategic Tolling Study in August and conducted a public hearing in September.  The Board is scheduled to approve the final report at their October meeting.  At the September meeting, the Board expressed a desire to create and add a statement of principles to the front of the final toll study that would be based on comments from the Board and the public, and on a letter that the MPO Board previously sent to the NCDOT Division 5 Engineer.  A draft of the statement of principles is attached, which has received input from staff, the Technical Committee (TC) and Board Chairman Seils.

 

Additional documents that are available for review include:

 

     *  A copy of the toll letter to NCDOT Division 5 -- attached

     *  A compilation of comments received -- attached

     *  The following MPO Web page has a copy of the final report: www.dchcmpo.org/programs/local/triangle_strategic_tolling_study.asp.

     *  The project Web site provides additional background information and toll related resources: www.triangletollingstudy.com

 

Board Action

TC Action: Recommend that the Board approve the final report for the Triangle Strategic Tolling Study with the inclusion of the statement of principles.

 

Board Action: Review and approve the final report for the Triangle Strategic Tolling Study with the inclusion of the statement of principles.