Title
Resolution on I-3306AC, I-40/NC 86 Interchange Improvements (10 minutes)
Aaron Cain, LPA Staff
Narrative
NCDOT is in the early stages of design for improvements to the I-40/NC 86 interchange, part of STIP project I-3306A, a widening of I-40 in Orange County to six lanes. At the January 16, 2019 DCHC MPO Board meeting, two members of the public spoke about concerns regarding the proposed improvements in one of the conceptual designs for the interchange, and the MPO Board directed staff to draft a resolution based on staff comments of the proposals. That draft resolution is attached, along with the following:
- DCHC MPO staff comments on the proposed designs;
- A resolution adopted by the Town of Chapel Hill on January 30, 2019;
- Interchange design Option 4A from NCDOT;
- Interchange design Option 4B from NCDOT.
Board Action
TC Action: Recommend that the MPO Board adopt the resolution on the design of the I-40/NC 86 interchange.
Board Action: Adopt the resolution on the design of the I-40/NC 86 interchange.