DCHCMPO Logo
File #: 20-158    Version: Name:
Type: Report Status: Passed
File created: 8/10/2020 In control: DCHC MPO Board
On agenda: 9/9/2020 Final action: 9/9/2020
Title: Designation of I-885 (10 minutes) John Grant, NCDOT
Attachments: 1. 2020-09-09 (20-158) I-885 Designation Map.pdf, 2. 2020-09-09 (20-158) I-885 Designation Resolution.pdf, 3. 2020-08-26 (20-158) I-885 Designation Map.pdf, 4. 2020-08-26 (20-158) I-885 Designation Resolution.pdf

Title

Designation of I-885 (10 minutes)

John Grant, NCDOT

 

Narrative

As a Federal Highway Administration (FHWA) requirement, NCDOT is requesting a resolution of support from DCHC MPO regarding the addition of I-885 in Durham County, which would be a continuous highway from I-85 to I-40 (see attached map). Upon completion of the East End Connector in Durham (U-0071), this highway would be designated as I-885. This designation would rename the portion of what is currently NC 147 from the East End Connector to I-40 as I-885. NC 147 south of I-40 would be redesignated as NC 885. NC 147 would remain from the new I-885 through downtown Durham to I-85.

 

Attached is a draft resolution supporting that designation.

 

Recommendation

TC Action: Recommended approval of the resolution supporting the designation of I-885 in Durham County with the inclusion of a statement that the new interstate designation does not impede the inclusion of future transit-priority lanes.

 

Board Action

Board Action: Adopt the resolution redesignating a portion of NC 147 as I-885, with a statement that this designation should not impede the inclusion of future transit-priority lanes.