File #: 19-144    Version: Name:
Type: Report Status: Filed
File created: 4/17/2019 In control: Technical Committee
On agenda: 12/8/2021 Final action: 12/8/2021
Title: US 15-501 Corridor Study (5 minutes) Andy Henry, LPA staff
Attachments: 1. 2021-03-10 (19-144) US15-501CorridorStudy-Scope, 2. 2021-02-24 (19-144) US15-501CorridorStudy-Scope, 3. 2021-01-27 (19-144) US15-501CorridorStudy-Scope, 4. 2021-01-13 (19-144) US15-501CorridorStudy-FollowOn, 5. 2021-01-06 (19-144) US15-501CorridorStudy-FollowOn, 6. 2020-11-04 (19-144) US 15-501 Response.pdf, 7. 2020-10-14 (19-144) US15-501 Comment Compilation.pdf, 8. 2020-09-09 (19-144) 15-501 Conceptual Design.pdf, 9. 2020-09-09 (19-144) Presentation.pdf, 10. 2020-09-09 (19-144) 15-501 Full Report.pdf, 11. 2020-09-09 (19-144) 15-501 Summary Report.pdf, 12. 2020-08-26 (19-144) 15-501 Conceptual Design.pdf, 13. 2020-08-26 (19-144) 15-501 Presentation.pdf, 14. 2020-08-26 (19-144) 15-501 Full Report.pdf, 15. 2020-08-26 (19-144) 15-501 Summary Report.pdf, 16. 2019-07-24 (19-144) US 15-501.pdf, 17. 2019-05-08 (19-144) US 15-501.pdf

Title

US 15-501 Corridor Study (5 minutes)

Andy Henry, LPA staff

 

Narrative

The DCHC MPO Board directed staff to solicit and select a consultant to finish the US 15-501 Corridor Study.  Staff drafted an RFI (Request for Information) for this purpose and published the RFI on February 24th.  The RFI is based on the attached scope of services.  Staff expect to select a consultant by mid-April and for the consultant to proceed with work by late May.

 

The following DCHC MPO Web page provides the final report documents and conceptual design for the US 15-501 Corridor Study and a compilation of the public comments: www.bit.ly/15-501.

 

Recommendation

TC Action: Forward the US 15-501 Corridor Study update to the DCHC MPO Board.

 

Board Action: Receive the US 15-501 Corridor Study update.